Route archive · Formby

The bypass built with green cycleways

When the Formby bypass opened in 1938, its four-mile corridor combined dual concrete carriageways with broad cycle tracks, separate pink footways and grass margins. Much of that unusually detailed design is now difficult to read.

Historic alignmentOpened 1938Separated cycle tracksUpdated 18 August 2026
Cyclist travelling beside an open green road corridor for Bike Boom's Formby route note
Archive routeBikeboom
A green roadside corridor can conceal several generations of infrastructure.Field-note illustration

Formby’s bypass was not planned as carriageway alone. Its cross-section treated cycling and walking as integral parts of a modern road.

Three broadly parallel cycling lines can be identified around Formby: an indirect route through the centre, an off-road line on a former railway alignment to the east, and the historic cycle tracks beside the A565 bypass between them. The bypass tracks are especially significant because they were included in the original 1930s road scheme rather than added later.

The surviving provision is uneven. Cycle tracks remain visible beside portions of the road, while other sections appear to have narrowed, changed status or disappeared beneath grass. Historical evidence indicates that the initial layout was more continuous than the present corridor suggests.

A complete roadside system

A commemorative brochure prepared for the bypass opening recorded a corridor approximately 120 feet wide between its boundaries. It described two 22-foot carriageways, a broad central reservation and, on both sides, nine-foot cycle tracks with six-foot footways and grass margins.

The distinction between the surfaces was deliberate. The cycle tracks were finished with green stone chippings rolled into a bituminous surface to provide a matt, non-skid finish. The footways used pink chippings, while the vehicle carriageways were built in substantial concrete bays.

This colour coding was not necessarily a national standard. Other period tracks used plain or differently coloured concrete and asphalt. At Formby, however, the contrasting materials made the functions of the corridor unusually legible.

Details designed around bicycles

The period specification extended beyond width and colour. The kerb beside the carriageway was kept low enough to reduce the chance of pedal contact. On the outer edge, a timber kerb sat flush with the cycle-track surface and grass margin so that a rider could cross it in an emergency.

That timber detail may also help explain later deterioration. Unlike stone or concrete edging, timber could decay and disappear if it was not renewed, leaving the track edge vulnerable to vegetation and encroachment.

The cycle-track foundation comprised consolidated clinker ballast, a bound course and a fine surface treatment. The adjacent footways used a related but lighter construction. In other words, these were purpose-built transport surfaces rather than incidental strips left over beside the road.

Bicycle beside a tree-lined path resembling a surviving historic cycle corridor
Why the route matters

A path can survive without looking complete

Historic infrastructure may remain as a visible track, an unexplained verge, a line of kerbs or a change in level. Formby demonstrates why the whole corridor must be read before a missing section is assumed to have vanished.

Reconnecting useful fragments would require current surveys, clear legal status, accessible crossings and links to today’s destinations. The archive establishes the earlier design; it does not by itself confirm present usability.

Original cross-section

Colour, width and separation

This simplified editorial diagram interprets the recorded 1938 arrangement. It is not a measured plan of current conditions.

Why the bypass was built this way

The bypass was first considered during the late 1920s, but the completed scheme reflected transport policy of the following decade. During a significant part of the 1930s, national road grants encouraged or required cycle tracks alongside selected arterial-road and bypass projects.

Contemporary local reporting presented the road as a modern means of separating different forms of traffic, improving flow and reducing conflict. The opening ceremony emphasised the dual carriageways, central reservation, cycle tracks and footways as parts of one coordinated design.

Traffic before the new road

A census reproduced in the opening brochure recorded substantial growth in bicycle use on the earlier road between 1928 and 1938. The published counts rose from 530 to 2,291 cyclists, while recorded motor-car use increased more slowly. These figures belong to a specific historic count and should not be treated as a present-day travel pattern.

The record nevertheless helps explain why cycle tracks were material to the scheme. Bicycles formed a significant part of traffic on the corridor, and their accommodation was not a decorative addition.

Construction and later change

Work began in April 1937, with most of the principal contract completed by September 1938. The carriageways used thick concrete over a consolidated foundation. Grass, resurfacing and later road alterations have since changed how the original cross-section can be understood on the ground.

Some track sections now have black surfacing similar to the carriageway. Elsewhere, the corridor’s width suggests that former paths may remain beneath vegetation. Only investigation and current land records can establish the exact condition and status of each section.

Reading the landscape

The original colour finishes may be gone, but alignment, separation and generous verge width can still reveal the structure of an earlier route.

How we read this route

From brochure to bypass

Bike Boom separates documentary evidence, present observation and possible future action.

Read the record

Extract dimensions, surfaces and construction details from contemporary material.

Trace the line

Compare the original arrangement with visible verges, kerbs and surviving paths.

Mark uncertainty

Do not assume that every broad verge contains an intact or usable cycle track.

Test connections

Consider crossings, housing links and onward routes before discussing restoration.

Present-day lessons

What Formby can still teach

The strongest lesson is not nostalgia for a coloured surface, but the value of designing the entire corridor coherently.

Width has lasting value

A generous original allocation can preserve options even after a path becomes obscured or neglected.

Edges deserve attention

Kerbs, margins and drainage influence comfort and durability just as much as the main surface.

Continuity is decisive

Short surviving sections cannot provide a dependable route if difficult gaps remain between them.

History is evidence, not permission

An old alignment requires present-day assessment, legal clarity and safe design before it can serve current journeys.

Route questions

Understanding the Formby corridor

Are the original cycle tracks still continuous?

No. Some portions remain visible, but other sections have narrowed, changed or become obscured. Current conditions must be checked independently.

Were the cycle tracks really green?

The 1938 construction description specifies green chippings in a matt, non-skid surface. The footways were described with pink chippings.

How wide were the tracks?

The opening brochure recorded nine-foot cycle tracks and six-foot footways on both sides of the bypass.

Is this part of a signed national route?

The historic bypass alignment is distinct from nearby signed routes and should not be assumed to have consistent present-day designation.

Can buried sections simply be reopened?

Not without investigation. Surface condition, ownership, drainage, crossings, accessibility and legal status all require assessment.

Is this article a navigation guide?

No. It is an editorial route history. Check current local information, restrictions and conditions before travelling.