Birmingham · Route history

A 1934 idea, built 85 years later

Birmingham once proposed a cycle track through the middle of a major road. The wartime cancellation left it on paper—but an A38 route completed in 2019 eventually put the central-reservation principle into practice.

Archive noteUrban cyclewayReviewed 18 July 2026
Cyclist using a protected urban route in a central road corridor for Bike Boom
A protected line through a broad road corridor can convert otherwise unused central space into a continuous cycling connection.

In 1934, plans for Birmingham’s A34 Walsall Road included a cycle track in a central reservation about 22 feet wide. The unusual position differed from the era’s national guidance, which generally placed cycleways beside the carriageways.

The proposal that remained on paper

The scheme was revised during 1937 and 1938, while retaining the central cycle track. The wider road-improvement programme was then cancelled after the outbreak of war in 1939. Birmingham therefore had a documented idea for middle-of-the-road cycling infrastructure, but no completed A34 route from that plan.

Central-reservation cycleways were rare in Britain. Their appeal is easy to understand: the alignment can avoid many property entrances and side-road interruptions found at the edge of a corridor. Their difficulty is equally clear. Riders must reach and leave the centre safely, and every crossing must communicate priority unambiguously.

A modern version on the A38

The protected A38 route between central Birmingham and Selly Oak introduced the concept in a modern form in 2019. Much of the route follows the sides of the road, while one notable section occupies the central reservation along Bristol Road.

That reservation was not empty land. It followed the line of a former tramway established in the late nineteenth century and removed in the 1950s. Reusing the corridor gave the cycleway a relatively green, direct section within a busy urban route.

Bicycle on a broad paved route with trees beside an urban corridor
Former transport alignments can offer direct routes, but the quality of access and crossings determines whether they function as a complete system.

The junction question

The central section’s value depends on more than separation between junctions. At side roads and crossroads, entrance geometry, visibility, signals and driver speeds influence whether riders can proceed comfortably.

Early observations raised practical questions about broad junction mouths and whether every movement would be controlled clearly. Those questions remain useful when assessing any protected route: good mid-block construction cannot compensate for uncertain priority at the points where paths and motor traffic meet.

An industrial cycling connection

The corridor also passes part of Bournbrook with a long association with cycle manufacturing. A large factory opened there in 1895 and produced bicycles before later becoming better known for motorcycles. The industrial site survived into the 1960s, while the surrounding district subsequently changed use.

This history does not mean the modern cycleway directly descends from the factory or the unbuilt 1934 proposal. It does, however, place the route within a corridor shaped repeatedly by bicycles, trams and changing forms of urban transport.

Corridor timeline

From turnpike to protected path

The route reflects several eras of transport planning. Dates identify changes in the corridor, not one continuous project.

Bristol Road altered

The former turnpike route towards Selly Oak was straightened and resurfaced.

Central tramway era

Tram infrastructure occupied the broad reservation later reused by part of the cycle route.

A34 cycle track proposed

A separate Birmingham plan placed a cycleway in the centre of Walsall Road.

Improvement scheme cancelled

The revised pre-war plan did not proceed after the outbreak of war.

A38 route completed

A modern protected connection included a central-reservation section on Bristol Road.

Design reading

Three details to inspect

A central alignment can reduce some conflicts, but it creates its own access and crossing requirements.

1

Safe entry

Riders need a direct, legible way to reach the reservation without negotiating an improvised traffic manoeuvre.

2

Clear priority

Junction design should make turning movements, give-way lines and cycle movements apparent to everyone.

3

Useful continuity

The protected section must connect onward rather than ending where the corridor becomes most difficult.

Continue reading

Compare the Birmingham corridor with other route histories and wider questions about cycling design.

Questions

Understanding the route

Was the 1934 cycleway built in 2019 exactly as planned?

No. The 1934 proposal concerned the A34 Walsall Road. The route completed in 2019 was a modern A38 project. The connection is the shared central-reservation concept, not one uninterrupted construction scheme.

Why place a cycleway in the middle of a road?

A central alignment can avoid frequent driveways and some side-road conflicts. It still needs safe access, carefully designed crossings and clear priority at every junction.

Did the A38 path replace a tramway?

Part of the central reservation follows a former tram corridor. The tram infrastructure had been removed decades before the protected cycle route was constructed.

Is this article a navigation guide?

No. It is an editorial history and design reading. Check current signs, works and local route information before travelling.

Why review junctions separately from the path?

Junctions concentrate interactions between different movements. A wide and comfortable path may still feel incomplete if crossings or turning conflicts are unclear.

Contact the desk

Have evidence about this corridor?

Send Bike Boom a correction, archive reference or present-day observation. Include the article title and enough context for the material to be checked.

Email Bike Boom